Following photographs show the varying methods used to improve the river for spawning
Gravel introduced to create new spawning site and new pool. Flow is increased over the raised area before running into the new pool and then tails out at the beginning of the next shallow runGravel introduced into what was a deeper slow flowing sectionRepairing area damaged by drainageRock introduced to provide structure and flow varianceRock introduced to create variance within the stream channelMembers of IFI discuss the positioning of newly introduced materials